About Me | Contact Info
| Home |
| General Music Information | Composed by me |
| Cubase SX | Cubase Patch Scripts |
| Studio Pictures | Studio Setup | Studio Equipment |
| Basement | Landscaping |
| 3D Stuff |
| BLOG |
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

Basement Page 4 Main Logo

Almost there

Construction has moved a bit slower since we worked on the yard over the summer. The theater section is almost complete. There are a few extras that need to be put in yet. New front speakers need to go in and the television needs to be raised slightly. This helps with the back row viewing. The surround system is running at 7.1. Some links for the equipment used will be found on another page once construction is done.

The diner section should get underway again in Nov. There will be a glass block bar with a custom made stainless steel bartop. So, look for that coming soon.

Almost there

Almost There
  Image Libraries
17 Aug 2005
small About Me | Contact Info | ©2005 RiVeTeD